Construction of a new disc golf course has begun on the property behind the shopping center and behind the homes along Olive Hill. Alan Crudden, Davis Spring resident, has graciously volunteered to help keep the City of Austin Parks and Recreation Department in constant dialog with our neighborhood. Alan has compiled a list of questions […]
Author: Frank Maulit
Board Meeting Agenda – August 21, 2018 6:30pm
Davis Spring H.O.A. Board Tuesday, August 21, 2018; Time 6:30pm Real Manage Business Office 9601 Amberglen, Suite 150 Austin, TX 78729 AGENDA Committee Reports Architectural Review Children’s playgroup – Open Garage Sale Landscaping Neighborhood watch – Open Playground Ant treatment status Inspection status/recommendation Pool Splash pad peeling Bathroom survey Social Welcoming Zoning Neenah construction […]
Neenah Construction Update – August 10, 2018
Progress this Week: Smith Contracting: Completed placing rock rip rap in between retaining walls. Formed and placed concrete for Holy Family School’s east driveway. Placed concrete for north side shared use path (SUP) in front of Holy Family School. Placed flexible base for north side SUP in front of Saint Dominic Savio High School to […]
Neenah Construction Updates July 27, 2018
Progress this Week: Smith Contracting: Completed excavation and poured the retaining wall and footing along the north side of drainage area. Backfilled the south side retaining wall between the new 12’ x 4’ box culvert and the existing box culvert in front of Holy Family School. Pond improvements continued. Formed and placed concrete for the […]
Neenah Construction Updates July 13, 2018
Progress this Week: Smith Contracting: Excavated the south side retaining wall footing at the Holy Family School. Poured concrete for the 12’x4’ box culvert upstream footings/apron. Poured concrete for the 5’x3’ box culvert upstream SET footing. Resumed pond improvements by installing the clay liner. Two Week Schedule: Smith Contracting: Continue pond improvement work. Continue flexible […]
Davis Spring HOA July 17, 2018 Board Meeting Agenda
Davis Spring H.O.A. Board Meeting Tuesday, July 17, 2018; Time 6:30pm Real Manage Business Office 9601 Amberglen, Suite 150 Austin, TX 78729 AGENDA Committee Reports Architectural Review Children’s playgroup – Open Garage Sale Landscaping Review requested tree maintenance bids Discuss work order visibility Neighborhood watch – Open Playground Playground post repairs Playground ant treatment […]
Neenah Construction Update July 6, 2018
Progress this Week: Smith Contracting: Excavated for the south side retaining wall in front of the Holy Family School. Poured concrete for the north side shared use path (SUP), in front of the St. Vincent de Paul Church. Excavated for the upstream headwall/wingwall footing for the 12’x4’ box culvert. Excavated and formed the upstream footing […]
Neenah Construction Updates 6/29/2018
Progress this Week: Smith Contracting: Excavated for the shared use path (SUP) in front of the Holy Family School. Poured the north side retaining wall in front of the Holy Family School. Installed 7’x7’ area inlet. Placed flexible base for SUP in front of the Church and Holy Family School. Two Week Schedule: Smith Contracting: […]
Neenah Construction Update June 15, 2018
Progress this Week: Smith Contracting: Poured the shared use path (SUP) between the Church and Holy Family. Poured the footing for the north side retaining wall in front of Holy Family. Installed 36-inch concrete pipe (RCP) in front of the Church. Installed 12’x4’ box culvert for the Holy Family driveway. Excavated and shaped Swale A, […]
Neenah Lane Closure Update
Because of our current rain situation and the forecast for more tomorrow, the lane closure that was supposed to happen tomorrow (Wednesday) has been postponed to this Friday between 10:00am and 2:00pm. Garry Brown Executive Assistant Office of Williamson County Commissioner Terry Cook 1801 E. Old Settlers Blvd. #110, Round Rock, TX 78664 Office main- […]